Florida Department of Environmental Protection Florida Department of Environmental Protection  
MyFlorida.com  

This data is current as of: September 17, 2014

Clear Dot Image
Select a Permit Type to View Specific Information
Permit Type
Total Under Review
Air - Construction Permit  
63
Air - Federally Enforceable State Operating Permit (FESOP)  
5
Air - General Permit  
27
Air - Operation Permit  
24
Air - Title V Operation Permit  
69
Corrective Action Permit Only  
1
Domestic Wastewater Biosolids  
6
Everglades - IW Group 7A, Design Daily Flow >500,000 GPD Permit  
10
Everglades CERPRA-CE  
5
Everglades EFA-EF  
1
Everglades Lake Okeechobee-LO  
5
Fullers Earth Reclamation  
1
Heavy Minerals Reclamation  
2
Joint Application Electronic Submittal  
2
Oil and Gas Permit  
94
Other Reclamation  
2
Phosphate Reclamation  
3
Siting Act Project New Application  
5
Stormwater - Large Construction (>= 5 AC)  
9
Stormwater - Multisector Generic Permit  
2
Stormwater - Small Construction (1-5 AC)  
8
Waste - Hazardous Waste Closure Permit  
1
Waste - Hazardous Waste Operation Permit  
3
Waste - Solid Waste Closure Permit  
11
Waste - Solid Waste Construction Permit  
2
Waste - Solid Waste Operation Permit  
40
Waste - Waste Tire Permit  
9
Water - Beaches CCCL General Permit  
9
Water - Beaches Construction Individual Permit  
162
Water - Beaches ERP Individual Permit  
1
Water - Beaches Exemption  
1
Water - Beaches JCP Minor Modification  
8
Water - Beaches Variance  
3
Water - Domestic Wastewater Collection/Transmission System  
126
Water - Domestic Wastewater Facility Permit  
4
Water - Domestic Wastewater Type I Facility Permit  
6
Water - Domestic Wastewater Type I Wastewater Treatment Plant Permit  
38
Water - Domestic Wastewater Type II Wastewater Treatment Plant Permit  
9
Water - Domestic Wastewater Type III (less than 10,000 gpd) Wastewater Treatment Plant Permit  
4
Water - Domestic Wastewater Type III Wastewater Treatment Plant Permit  
25
Water - Dredge and Fill Permit  
3
Water - Drinking Water Distribution System General Permit  
38
Water - Drinking Water Distribution System Permit  
4
Water - Drinking Water Treatment Construction Permit  
22
Water - ERP Exemption Permit  
236
Water - ERP Formal Determination  
68
Water - ERP Modifications  
51
Water - ERP Noticed General Permit  
83
Water - ERP Variance  
1
Water - Individual Stormwater System Permit  
3
Water - Individual With No Conceptual Approval Permit  
165
Water - Industrial Wastewater Concrete Batch Plant Permit  
3
Water - Industrial Wastewater Facility Permit  
3
Water - Industrial Wastewater Group 1, Non-surface Water Discharge Permit  
5
Water - Industrial Wastewater Group 1, Surface Water Discharge Permit  
10
Water - Industrial Wastewater Group 10B - Other Facility Permit  
7
Water - Industrial Wastewater Group 3, Surface Water Discharge Permit  
2
Water - Industrial Wastewater Group 4A, Feedlots W/> Than Number Of Listed Animals Permit  
6
Water - Industrial Wastewater Group 4C, Egg Production, Major Permit  
1
Water - Industrial Wastewater Group 5B, Design Daily Discharge >100,000 to 500,000 GPD Permit  
1
Water - Industrial Wastewater Group 6A, BTU/HR Heat Loss >100 Million Permit  
1
Water - Industrial Wastewater Group 7A, Design Daily Flow >500,000 GPD Permit  
1
Water - Industrial Wastewater Group 7B, Design Daily Flow >100,000 Up to 500,000 GPD Permit  
4
Water - Industrial Wastewater Group 7D, Design Daily Flow 50,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 8C, Design Daily Flow >50,000 to 100,000 GPD Permit  
1
Water - Industrial Wastewater Group 8D, Design Daily Flow of 50,000 or Less GPD Permit  
1
Water - Industrial Wastewater Group 9A, Recycling >10,000 GPD Permit  
1
Water - Industrial Wastewater Group 9B, Recycling 10,000 or Less GPD Permit  
1
Water - Industrial Wastewater Petroleum Cleanup Site Permit  
10
Water - Injection Well Construction Permit  
72
Water - Injection Well Operation Permit  
42
Water - Injection Well Permit  
7
Water - Joint Coastal Permit  
27
Water - Mangrove Alterations Permit  
16
Water - Mangrove Exemptions  
3
Water - Mitigation Bank Permit  
3
Water - Underground Injection Control - Construction/Operation Permit  
2

Contact The Office of Public Services whenever you have questions or concerns about the permit data.